{"iri":"https://w3id.org/bimei/term/master-information-delivery-plan","type":"term","register":"canonical","status":"canonical","grounding":"pending","liveVersion":4,"pinned":false,"version":null,"provenance":{"sourceApp":"legacy-bimd","sourceId":"master-information-delivery-plan","changeSource":"override","curator":"Bilal Succar","curatorRole":"Head Editor"},"language":"en","jurisdiction":null,"label":{"lang":"en","jurisdiction":null,"requestedJurisdiction":null,"fellBack":false,"prefLabel":"Master Information Delivery Plan","description":"The plan in which a [[Lead Appointed Party]] brings together the [[Task Team Information Delivery Plan]] of each of its task teams, giving one schedule of the information its [[Delivery Team]] will deliver under an [[Appointment]]. Under [[ISO 19650-2]] (5.4.5) it belongs to a delivery team, so a project with several appointments has several, each tied to the project's [[Information Delivery Milestone]]s. In assembling it, the lead appointed party checks each task team's deliverables against the [[Detailed Responsibility Matrix]], sequences information that one task team needs from another, and allows time for its own review and authorisation and for the appointing party's review and acceptance. It then fixes the deliverables and dates as a baseline, tells task teams what in their plans must change, and warns the [[Appointing Party]] of any risk to a milestone. Each entry is an [[Information Container]], such as a model, drawing, schedule or report, with its author, dependencies, level of information need and due date. The plan forms part of the appointment documents (5.4.6) and changes only through change control","altLabels":["MIDP"]},"labels":{"ca":{"GB":{"prefLabel":"Màster Pla de Lliuraments d'informació","description":"Un pla que contempla tots els lliurables d'informació d'un projecte, incloent models, plànols, especificacions, equips, llistats i [[Fitxes Tècniques d'Espais]]. Un Màster Pla de Lliurables d'Informació (MPLI) identifica quan cal preparar la informació, qui ho ha de fer i quins protocols i procediments s'han de fer servir. Un MPLI inclou [[Plans de Lliurament d'Informació d'Equips de Treball]] (PLIE) i una [[Matriu de Responsabilitats]] (MR) actualitzada / detallada","altLabels":[]}},"es":{"GB":{"prefLabel":"Master Plan de Entregas de Información","description":"Un plan que contempla todos los entregables de información de un proyecto, incluyendo modelos, planos, especificaciones, equipos, listados y [[Fichas Técnicas de Espacios]]. Un Master Plan de Entregas de Información (MPEI) identifica cuándo debe prepararse la información, por quién, y qué protocolos y procedimientos deben usarse. Un MPEI incluye [[Planes de Entrega de Información de Equipos de Trabajo]] (PEIE) y una [[Matriz de Responsabilidades]] (MR) actualizada/detallada","altLabels":[]}},"cs":{"GB":{"prefLabel":"Hlavní plán pro předávání informací","description":"Plán vypisující veškeré informace výstupů projektu včetně modelů, výkresů, specifikací, vybavení, harmonogramů a [[Tabulek místností]]. Hlavní plán pro předávání informací (MIDP) rozpoznává, kdy mají být informace o projektu připraveny, kým mají být připraveny a za použití jakých protokolů a postupů. MIDP zahrnuje všechny související [[Plány týmů pro předávání informací]] (TIDP) a aktualizovanou/detailní [[Matici odpovědnosti]]","altLabels":["Hlavní plány pro předávání informací","Hlavních plánů pro předávání informací","Hlavního plánu pro předávání informací","Hlavním plánem pro předávání informací"]}},"ar":{"GB":{"prefLabel":"خطة تسليم معلومات رئيسية","description":"خطة تسرد تسليمات كافة المعلومات التي يمكن تحقيقها للمشروع بما في ذلك النماذج والرسومات والمواصفات والمعدات والجداول الزمنية و [[ورقة بيانات الغرفة]]. تحدد خطة تسليم المعلومات الرئيسية (MIDP) متى يتم إعداد معلومات المشروع، ومن خلال من، وأي من البروتوكولات والإجراءات سيتم استخدامها. ويشمل برنامج MIDP على جميع [[خطط تسليم معلومات  فريق المهمة]]، (TIDP)s و [[مصفوفة تحديد المسؤوليات]] المحدثة / التفصيلية","altLabels":[]}},"de":{"GB":{"prefLabel":"Masterinformationslieferungsplan","description":"Ein Plan, der alle Informationsleistungen eines Projekts auflistet, einschließlich Modelle, Zeichnungen, Spezifikationen, Ausrüstungen, Zeitpläne und [[Raumdatenblatt]]s. Ein Master Information Delivery Plan (MIDP) identifiziert, wann, von wem und mit welchen Protokollen und Verfahren Projektinformationen erstellt werden sollen. Ein MIDP beinhaltet alle relevanten [[Task Team Information Delivery Plan]]s (TIDP)s und eine aktualisiert/detaillierte [[Responsibility Matrix]].","altLabels":[]}},"tr":{"GB":{"prefLabel":"Temel Bilgi Teslim Planı (TBTP)","description":"Bir projenin modeller, çizimler, şartnameler, ekipman, şemalar ve [[Mahal Listeleri]]ni içeren bütün bilgi teslimlerinin listelendiği bir plan. Bir Temel Bilgi Teslim Planı proje bilgilerinin ne zaman, kim tarafından ve hangi protokoller ve prosedürlere göre hazırlanacağını tanımlar. Bir TBTP, bütün ilgili [[Görev Ekibi Bilgi Teslim Planları]]nı ve güncellenmiş/detaylandırılmış [[Sorumluluk Matrisleri]]ni kapsar","altLabels":[]}},"en":{"GB":{"prefLabel":"Master Information Delivery Plan","description":"The plan in which a [[Lead Appointed Party]] brings together the [[Task Team Information Delivery Plan]] of each of its task teams, giving one schedule of the information its [[Delivery Team]] will deliver under an [[Appointment]]. Under [[ISO 19650-2]] (5.4.5) it belongs to a delivery team, so a project with several appointments has several, each tied to the project's [[Information Delivery Milestone]]s. In assembling it, the lead appointed party checks each task team's deliverables against the [[Detailed Responsibility Matrix]], sequences information that one task team needs from another, and allows time for its own review and authorisation and for the appointing party's review and acceptance. It then fixes the deliverables and dates as a baseline, tells task teams what in their plans must change, and warns the [[Appointing Party]] of any risk to a milestone. Each entry is an [[Information Container]], such as a model, drawing, schedule or report, with its author, dependencies, level of information need and due date. The plan forms part of the appointment documents (5.4.6) and changes only through change control","altLabels":["MIDP"]},"*":{"prefLabel":"Master Information Delivery Plan","description":"The plan in which a [[Lead Appointed Party]] brings together the [[Task Team Information Delivery Plan]] of each of its task teams, giving one schedule of the information its [[Delivery Team]] will deliver under an [[Appointment]]. Under [[ISO 19650-2]] (5.4.5) it belongs to a delivery team, so a project with several appointments has several, each tied to the project's [[Information Delivery Milestone]]s. In assembling it, the lead appointed party checks each task team's deliverables against the [[Detailed Responsibility Matrix]], sequences information that one task team needs from another, and allows time for its own review and authorisation and for the appointing party's review and acceptance. It then fixes the deliverables and dates as a baseline, tells task teams what in their plans must change, and warns the [[Appointing Party]] of any risk to a milestone. Each entry is an [[Information Container]], such as a model, drawing, schedule or report, with its author, dependencies, level of information need and due date. The plan forms part of the appointment documents (5.4.6) and changes only through change control","altLabels":["MIDP"]}}},"seeAlso":["https://w3id.org/bimei/term/bim-execution-plan","https://w3id.org/bimei/term/exchange-information-requirements","https://w3id.org/bimei/term/responsibility-matrix"]}