{"iri":"https://w3id.org/bimei/term/project-information-model","type":"term","register":"canonical","status":"canonical","grounding":"pending","liveVersion":4,"pinned":false,"version":null,"provenance":{"sourceApp":"legacy-bimd","sourceId":"project-information-model","changeSource":"override","curator":"Bilal Succar","curatorRole":"Head Editor"},"language":"en","jurisdiction":null,"label":{"lang":"en","jurisdiction":null,"requestedJurisdiction":null,"fellBack":false,"prefLabel":"Project Information Model","description":"The [[Information Model]] relating to the delivery phase of an [[Asset]], built up by the delivery teams as a project is designed and constructed. [[ISO 19650-1]] (5.7) gives typical contents such as project geometry, equipment locations, performance requirements, construction methods, programme and cost information, and details of the systems and components installed, including their maintenance needs. What it must contain, and in what form, is set by the [[Exchange Information Requirements]] of each appointment. Early in a project the model mainly conveys design intent; later it represents the asset to be constructed, and by handover it should record what was actually built. The project information model is not a single model file but the set of [[Information Container]]s delivered through the [[Common Data Environment]], and at the end of the project it holds only published and archived information. The containers needed to operate the asset then pass into the [[Asset Information Model]]. The rest are kept read-only for a period set in the exchange information requirements, in case of dispute and as a source of lessons for future projects","altLabels":["PIM"]},"labels":{"cs":{"GB":{"prefLabel":"Informační model projektu","description":"Dílčí typ [[Informačních modelů]] vyvinutý v průběhu návrhové, výrobní a realizační (nebo modernizační) fáze projektu. Při předání díla je Informační model projektu (PIM) základem pro [[Informační model aktiva]] (AIM), tudíž musí reprezentovat to, co bylo opravdu postaveno a ne to, co bylo zamýšleno projektanty","altLabels":["Informační modely projektu","Informačních modelů projektu","Informačního modelu projektu"]}},"ar":{"GB":{"prefLabel":"نموذج معلومات المشروع","description":"هو نوع فرعي من [[نموذج المعلومات]] تم تطويره خلال أطوار التصميم والإنتاج والبناء (أو التجديد) للمشروع. وعند التسليم، يكون نموذج معلومات المشروع (PIM) هو أساس [[نموذج معلومات الأصل]] (AIM)، وبالتالي فإنه سيمثل ما تم تثبيته بالفعل وليس ما كان يقصده المصممون","altLabels":[]}},"de":{"GB":{"prefLabel":"Projektinformationsmodell","description":"Ein Subtyp von [[Information Model]]s, der während der Entwurfs-, Produktions- und Bauphase (oder Renovierungsphase) eines Projekts entwickelt wurde. Das Project Information Model (PIM) ist bei der Übergabe die Grundlage für das [[Asset Information Model]]. (AIM) und muss somit das darstellen, was tatsächlich installiert wurde und nicht das, was die Planer beabsichtigten.","altLabels":[]}},"tr":{"GB":{"prefLabel":"Proje Bilgi Modeli","description":"Bir projenin tasarım, üretim ve yapım (veya yenileme) aşamalarında geliştirilen [[Bilgi Modelleri]] bir alt türü. Proje Bilgi Modeli (PBM) kabul aşamasında, [[Varlık Bilgi Modeli]]nin (VBM) temelini oluşturur ve bu nedenle tasarımcılar tarafından planlananı değil, gerçekte yapılmış olanın temsil etmelidir","altLabels":[]}},"en":{"GB":{"prefLabel":"Project Information Model","description":"The [[Information Model]] relating to the delivery phase of an [[Asset]], built up by the delivery teams as a project is designed and constructed. [[ISO 19650-1]] (5.7) gives typical contents such as project geometry, equipment locations, performance requirements, construction methods, programme and cost information, and details of the systems and components installed, including their maintenance needs. What it must contain, and in what form, is set by the [[Exchange Information Requirements]] of each appointment. Early in a project the model mainly conveys design intent; later it represents the asset to be constructed, and by handover it should record what was actually built. The project information model is not a single model file but the set of [[Information Container]]s delivered through the [[Common Data Environment]], and at the end of the project it holds only published and archived information. The containers needed to operate the asset then pass into the [[Asset Information Model]]. The rest are kept read-only for a period set in the exchange information requirements, in case of dispute and as a source of lessons for future projects","altLabels":["PIM"]},"*":{"prefLabel":"Project Information Model","description":"The [[Information Model]] relating to the delivery phase of an [[Asset]], built up by the delivery teams as a project is designed and constructed. [[ISO 19650-1]] (5.7) gives typical contents such as project geometry, equipment locations, performance requirements, construction methods, programme and cost information, and details of the systems and components installed, including their maintenance needs. What it must contain, and in what form, is set by the [[Exchange Information Requirements]] of each appointment. Early in a project the model mainly conveys design intent; later it represents the asset to be constructed, and by handover it should record what was actually built. The project information model is not a single model file but the set of [[Information Container]]s delivered through the [[Common Data Environment]], and at the end of the project it holds only published and archived information. The containers needed to operate the asset then pass into the [[Asset Information Model]]. The rest are kept read-only for a period set in the exchange information requirements, in case of dispute and as a source of lessons for future projects","altLabels":["PIM"]}}},"seeAlso":["https://w3id.org/bimei/term/federated-model","https://w3id.org/bimei/term/federation-strategy","https://w3id.org/bimei/term/project-information-requirements"]}